wpc の壁パネルの取付け

wpc wall panel installation Minutes of outdoor wpc wall panel installation: Exploring a new chapter of green decoration As the concept of environmental protection has become more popular, green building materials have gradually become the mainstream of the market. As an emerging environmentally friendly decorative material, outdoor wpc wall panel has been favored by the…

wpc の壁パネルの取付け

Minutes of outdoor wpc の壁パネルの取付け: Exploring a new chapter of green decoration

As the concept of environmental protection has become more popular, green building materials have gradually become the mainstream of the market. As an emerging environmentally friendly decorative material, outdoor 壁パネル has been favored by the majority of users for its characteristics of heat insulation, dirt resistance, moisture resistance, flame retardancy and simple construction. This article will record in detail the whole process of outdoor wpc の壁パネルの取付け, in order to provide reference and reference for similar projects.

1. Preparation before construction

1. Material preparation: Before construction, we first checked the model and size of the 壁パネル to ensure that the material meets the design requirements. At the same time, we carefully checked whether the surface of the wall panel was damaged to ensure the quality of each wall panel.

2. Tool preparation: According to the construction requirements, we prepared tools such as hammers, saws, levels, plumbs, paper cutters, tape measures, scissors, etc., which provided convenience for construction.

3. Construction plan formulation: Before construction, we conducted a field survey of the construction site, combined with the design drawings, formulated a detailed construction plan, and clarified the construction process and precautions.

2. Construction process

1. Base treatment: Before construction, we cleaned the wall to ensure that the wall was flat and clean. At the same time, horizontal and vertical lines were popped up on the wall as a benchmark for installing wall panels.

2. Install the starting strip and frame: According to the popped-up horizontal line, we installed the starting strip and frame. During the installation process, pay attention to keeping the horizontal and vertical to ensure the installation quality of the wall panels.

3. Install the wall panels: After the starting strip and frame are installed, we start to install the wall panels. During the installation process, follow the principle of “nail first and then hang” to ensure that the wall panels are closely connected to the base. At the same time, pay attention to the position and spacing of the nails to avoid affecting the expansion and contraction of the wall panels.

4. Closing treatment: After the wall panels are installed, we close the corners, door and window edges and other locations to ensure the beauty and practicality of the wall.

5. Keel installation: During the installation of the wall panels, we installed the keels simultaneously. The keel spacing is kept at 5-6cm to ensure the stability of the wall panels.

6. Adjustment and fixing: After the wall panels and keels were installed, we adjusted the wall to ensure the verticality and horizontality of the wall. Then, we used self-tapping screws to fix the wall panels and keels together to ensure the stability of the wall.

7. Grouting and filling: After the wall panels were fixed, we grouted and filled the gaps in the wall to ensure the flatness and beauty of the wall.

III. Precautions during construction

1. Follow the construction plan: During the construction process, we strictly followed the construction plan to ensure the smooth progress of the construction.

2. Pay attention to safety: During the construction process, we paid attention to safety and wore protective equipment such as safety helmets and gloves to ensure the safety of construction workers.

3. Construction details: During the construction process, we paid attention to details such as the location and spacing of nails, the expansion and contraction of wall panels, etc. to ensure the quality of construction.

IV. Acceptance and maintenance after construction

1. Acceptance: After the construction is completed, we inspected the wall to ensure that the flatness, verticality, and beauty of the wall meet the design requirements.

2. Maintenance: After the acceptance, we maintained the wall, such as cleaning the wall, applying protective coatings, etc., to ensure the service life of the wall.

Summary: Through this outdoor wpc の壁パネルの取付け, we have accumulated rich experience and have a deeper understanding of the construction of green building materials. In future work, we will continue to explore the construction technology of green building materials and contribute to the development of green building in my country. At the same time, we also hope that this construction minutes can provide reference for similar projects and jointly promote the development of green building.